Quality

Process checks at each fabrication stage

Our Approach

Consistency comes from the process, not a certificate

We haven't listed formal certifications here because none are currently held — if that changes, this page will be updated. In the meantime, here's how quality is controlled during fabrication.

Material Verification

Incoming MS pipe, sheet and FRP raw material is checked against order specifications before it goes into fabrication.

Weld Quality Checks

Welded joints on frames and towers are visually inspected for consistency and finish before parts move to coating.

Dimensional Accuracy

Platform heights, railing gaps and slide dimensions are checked against the approved drawing for each order.

Powder Coating Consistency

Coating thickness and surface preparation are checked to reduce the risk of early corrosion or peeling.

FRP Moulding Checks

Moulded slide chutes and seating shells are inspected for surface finish and structural thickness.

Pre-Dispatch Inspection

Assembled or part-assembled units are checked against the order sheet before they leave the workshop.

A note on certifications: We only list certifications and standards that are currently held and can be verified on request. If your project requires a specific certification, let us know at the enquiry stage and we'll confirm whether it applies to your order.

Questions about a specific order?

We're glad to walk through material or finish details before you confirm.